Once the system is designed by the CNE and the decisions
have been made regarding the use and upgrade of present hardware, if any, then
Connectco proceeds to a detailed software, hardware quote and professional
services estimate for final client O.K. These will include training and
support, both of which are discussed on other pages.
|
| I. Schedule |
|
|
|
Once the client approves the system design and training,
Connectco schedules the system implementation. A schedule is drawn for the
software and hardware, and procurement goes forward. |
| II. Customization by Manufacturer
|
|
|
|
Complete configurations for any new workstations or
peripherals will be specified by Connectco and installed by the manufacturer,
where labor is less expensive. |
| III. System Integration |
|
|
|
Connectco performs all systems integration of new hardware,
including the new network server(s), in Connectco's own Systems Integration
laboratory. All server and work station software is installed, including the
business systems and netware. Existing licensed client software which will
operate on the new network or is to be installed on the new work stations is
borrowed on disc or CD-ROM from the client and installed on the server(s) and
new work stations, all at the Connectco lab. This saves travel and allows
uninterrupted systems work, which leads to much lower professional labor costs.
|
|
In addition, all required software for the new work stations
and printer server(s) is installed at the Connectco lab,. New printers and
other peripherals are integrated and tested. Hardware upgrades or software
installation on existing servers, work stations, printers, or other peripherals
which cannot be spared by the client but are due to be upgraded or used
"as is" in the network, can await system installation at the client's
place of business. |
| IV. Cable Installation |
|
|
|
Concurrent with systems integration work at Connectco's lab,
Cablemasters, our associate, will install the necessary network cables, plug
boards, and any intra-net communications (e.g., between buildings). They will
test each termination to assure the integrity and speed of the network. All
cable installation, terminations, and tests are performed to the accepted
standards of the industry and the netware supplier (Novell, LANtastic, or
other). |
| V. Final Installation |
|
|
|
Installation at the client's place of business begins as
soon as the server(s) new work stations and new peripherals have been
configured and integrated with the software and each other. The CNE will
configure the network with names, passwords, access groups, and other security
systems, both internal and remote. |
|
Because of the extensive preliminary systems work done by
the hardware manufacturer and at the Connectco lab, our clients experience a
minimum of down time and little remaining labor is necessary to install the
system for the client. |
|
Connectco specifies to the client, in advance, the
environment for the server(s). (For example, it is important to maintain
constant, cool, dust-free running conditions for the servers, since they will
be operating continuously. Server down-time adversely effects the network and
the business.) |
|
After installing the complete network and all new and
existing work stations and peripherals, Connectco will run a final system
integration test. The test will include each and every work station, server,
and peripheral. At this point, with all software loaded, including the
specified business system and office automation packages, the system is ready
to run. |
|